CEIIA IS A KEY PARTNER IN THE ENTIRE DEVELOPMENT CYCLE OF THE NEW KC-390, THE LARGEST AIRCRAFT EVER PRODUCED BY EMBRAER.
This participation is focused on two primary structures (the elevator and the central fuselage) and on the sponson and included activities such as Design, Stress Analysis, Weight Reduction, Manufacturing Support, the production of the First Flight Documentation and Certification Documentation and the definition and execution of tests.


ELEVATOR
ENTIRE DEVELOPMENT CYCLE OF KC-390 ELEVATOR STRUCTURE
FROM CONCEPTUAL TO CERTIFICATION PHASE (BOTH INCLUDED)

MAIN ACTIVITIES
Design
Stress Analysis including F&DT
Weight Reduction Campaign
Manufacturing Support
First Flight Documentation
Certification Documentation
Definition & execution Tests
Tooling
and GSE
PERIOD
2011 - Ongoing
LOCATION
Brazil (until PDR) and Portugal
CENTRAL FUSELAGE
DETAIL DESIGN OF THE KC-390 CENTRAL FUSELAGE
AND RE-DESIGN IN ORDER TO IMPLEMENT A WEIGHT REDUCTION CAMPAIGN

MAIN ACTIVITIES (DETAILED DESIGN)
3D models
& FTA
Configuration Control
Installation drawings
PERIOD
2013
LOCATION
Portugal and Spain
MAIN ACTIVITIES (WEIGHT REDUCTION)
3D models
& FTA
Configuration Control
Installation drawings
Production
Support
PERIOD
2014
LOCATION
Portugal
SPONSON
ENTIRE DEVELOPMENT CYCLE OF KC-390 SPONSON STRUCTURE (WITH MAIN LANDING GEAR DOOR) FROM CONCEPTUAL TO CERTIFICATION PHASE (BOTH INCLUDED)

MAIN ACTIVITIES
Design
Stress Analysis including F&DT
Weight Reduction Campaign
Certification Documentation
Definition & execution Tests
Tooling
and GSE
PERIOD
2011 - Ongoing
LOCATION
Brazil (until PDR) and Portugal